YTHX 2025 LIGHTING BREAKDOWN

  • These made up the primary look of the rig as well as providing practical back light for the room. 9 of them were ran in 11 channel mode, while the remaining 82 were ran in 74 Channel mode. This required an additional need of 6,068 parameters across 16 universes.

  • We had some tight timelines on this in and out so we opted for a pre-rigged solution with GT truss.

  • We ultimately hung 25 additional motors to handle main truss hangs as well as cable picks.

THE DESIGN PROCESS

The overall goal was for the design to start on stage and reach out into the crowd. We knew we wanted bright and we wanted immersive.

Previous
Previous

Easter at Elevation 2025